- Fabricated new dash & included cheap Autozone oil pressure and water temp gauges along with lights for low oil pressure, neutral and high water temp.
- Completed the wiring harness. The partially completed harness which came with the car worked out very well.
- Completed the accusump installation.
- Added a fuel pressure gauge and completed the fuel plumbing.
I will be test firing the engine very soon, hope all goes well.
The last major items on the rebuild list are:
- Make a mold of the original seat and create a new seat for taller drivers
- Adjust the diff location and install a new chain
- Set-up the car
- Safety wire
- Build a heat shield for the header
- Bleed brakes